Client Background
The Federal Inland Revenue Service (FIRS) is Nigeria’s principal tax authority, responsible for
assessing, collecting, and accounting for federal taxes. As the agency driving government
revenue generation, its headquarters requires a highly reliable and uninterrupted power supply
to support critical administrative operations, digital infrastructure, and public service delivery.
The Challenge
FIRS required a dependable 6MW power solution capable of supporting its headquarters
without interruption. The project demanded a power system that would deliver consistent
performance, high operational reliability, and seamless integration with the facility’s existing
electrical infrastructure while meeting strict project timelines.
FIRS Headquarters, Abuja
6MW Independent Power Plant (Completed: November 2025)
No video or image available for this project.
The Solution Mikano Power designed and delivered a customized Independent Power Plant (IPP) solution tailored to the power requirements of the FIRS Headquarters.
Design, supply, installation, and commissioning of a 6MW IPP solution.
Integrated multiple generator units to provide reliable and continuous power.
Complete mechanical, electrical, and control system integration.
Fully synchronized power generation for stable load sharing and operational efficiency.
End-to-end engineering, project management, testing, and commissioning executed by Mikano's in-house specialists.
Technical Highlights
Total Installed Capacity: 6MW
Independent Power Plant (IPP)
Fully synchronized generator configuration
Complete engineering, procurement, installation, and commissioning (EPIC)
Reliable power solution designed for mission-critical government operations
The Results
Mikano Power successfully delivered a reliable 6MW Independent Power Plant that provides
uninterrupted power to one of Nigeria's most important government institutions. The project
demonstrates Mikano's expertise in executing large-scale power infrastructure projects for the
public sector while reinforcing its reputation as Nigeria's leading provider of integrated power
solutions.
Related Projects & Services
NNPC Headquarters — 17.2MW WÄRTSILÄ Power Plant, Abuja
4 units of WÄRTSILÄ generators
MTN Switch, Asaba
2 units of 1460kVA MTU generators
MTN, Owerri
1 Unit of a 1460 kVA MTU Generator
Sumal Foods, Ibadan
5 units of 1.5MW MTU Generators
Eko Atlantic, Lagos
4 units of 1.5MW MTU Generators