Client Background

MTN Nigeria is the country’s leading telecommunications providers, delivering voice and data services to millions of subscribers nationwide. To maintain seamless network performance in Owerri, Imo State, MTN required a dependable independent power solution to support its critical telecom infrastructure and ensure uninterrupted service delivery.

The Challenge

MTN Owerri needed a reliable power system capable of supporting continuous telecom operations, where downtime is not an option. The solution had to deliver consistent output, operate efficiently for long hours, and meet strict reliability standards while remaining easy to maintain and suitable for a sensitive operational environment.

No video or image available for this project.

Mikano International Limited delivered a robust IPP solution featuring one 1460 kVA generator, carefully selected to meet MTN’s power requirements and operational expectations. The generator was professionally supplied, installed, and commissioned by Mikano’s expert technical team, ensuring optimal performance and system stability. The solution was designed for durability, efficiency, and continuous operation, providing MTN Owerri with a dependable power backbone to support its telecommunications services.

Technical Highlights

Power Capacity: 1 × 1460 kVA generator

Power Capacity: 1 × 1460 kVA generator

Application: Independent Power Plant (IPP) for telecom infrastructure

Application: Independent Power Plant (IPP) for telecom infrastructure

Operational Design: Built for continuous, long-hour operation

Operational Design: Built for continuous, long-hour operation

Efficiency: Optimized fuel consumption for cost-effective performance

Efficiency: Optimized fuel consumption for cost-effective performance

Reliability: Engineered to deliver stable power for critical network equipment

Reliability: Engineered to deliver stable power for critical network equipment

Support: Installed and commissioned by Mikano’s certified technical team

Support: Installed and commissioned by Mikano’s certified technical team

The Result

Mikano Power successfully delivered a robust and reliable IPP solution that ensures uninterrupted power for MTN’s switch operations in Owerri. The system provides stable performance, improved operational efficiency, and long-term reliability for mission-critical telecom infrastructure. This project further reinforces Mikano’s position as a trusted partner for delivering dependable power solutions across Nigeria.